Client: Uganda agovernment

Ayago Hydropower Project- Nwoya & Kiryandongo, Uganda

Project Scope.

Ayago Hydro Power Project is a 650 MW Power Plant to be located on the River Nile. MEMD proposed to develop the entire natural head drop of 82m as a single power plant project with a dam to increase the natural head and at the same time utilizing a surface canal and tunnels to convey the water to an underground power house and discharging the water back to the river through tailrace tunnels.

Our Services

Environmental and Social Impact Assessment and Resettlement Action Plan (RAP) for the Ayago Hydropower Project and associated interconnection transmission lines and sub stations and liaising with NEMA and other stakeholders