Client: Suwal Industries

Karuma Hydro Power Plant Project- Masindi, Kiryandongo and Nwoya Districts- Uganda

Project Scope

Karuma Hydro Power Project of a 650 – 700 MW Power Plant located on the River Nile about 80 km downstream of Masindi port on the exit of Lake Kyoga in central Uganda. MEMD proposed to develop the entire natural head drop of 76m as a single power plant project with a dam to increase the natural head and at the same time utilising a surface canal and tunnels to convey the water to an underground power house and discharging the water back to the river through tailrace tunnels.

Our Services

Environmental and Social Impact Assessment and Resettlement Action Plan (RAP) for Karuma Hydro Power Plant Project and associated interconnection transmission lines and sub stations and liaising with NEMA and other stakeholders.